Cirrus SR20 — Stephen_Shields_SR20_CHECKLIST_v1.3 (Mar-06) NOT FOR FLIGHT — source fidelity: unreviewed | operational review: none | completeness: full Source: Cirrus/SR20/Stephen_Shields_SR20_CHECKLIST_v1.3 (Mar-06).txt Rights: licensed Checklist hash: 7abf087ac71adcef31e1eb42bef01331394e31b717bdb064b405e6a065a7e879 Verify against the aircraft's own approved documentation before use. ======================================================================== BEFORE STARTING ENGINE ---------------------- [ ] Preflight ................................................. COMPLETED [ ] Place ignition keys on dash ........... PLACE IGNITION KEYS ON DASH [ ] Hobbs Meter .................................. NOTE TIME IN LOGBOOK [ ] Emergency Equipment ........................................ ON BOARD [ ] Passengers .................................................. BRIEFED [ ] Seats, Seat Belts & Harnesses ....................... ADJUST & SECURE STARTING ENGINE --------------- ** WARNING: KEEP ALL PERSONNEL & STARTING CABLES FREE OF PROPELLER [ ] External Power (if applicable) .............................. CONNECT [ ] Brakes ......................................................... HOLD [ ] Battery Master Switches .......................................... ON [ ] Strobe Lights .................................................... ON [ ] Mixture ................................................... FULL RICH [ ] Power Lever ............................................. OPEN ¼ INCH [ ] Fuel Pump .............. PRIME (only on cold first start), then BOOST ** NOTE: NO BOOST REQUIRED IF ENGINE IS STILL WARM (off less than 60 min. in warm weather, less than 30 min. in cold weather) [ ] Propeller Area ................................................ CLEAR [ ] Power Lever ............................................. OPEN ¼ INCH [ ] Ignition Switch ............................................... START [ ] Power Lever ...................................... RETARD TO 1000 RPM [ ] Oil Pressure .................................................. CHECK [ ] Alt Master Switches .............................................. ON [ ] Avionics ......................................................... ON [ ] Engine Parameters ........................................... MONITOR [ ] External Power (if applicable) ........................... DISCONNECT [ ] Ammeter ....................................................... CHECK BEFORE TAKEOFF RUNUP -------------------- ** NOTE: COMING FROM e-checklist [ ] Boost Pump ............................................. CONFIRM ON [ ] Power Level ................................................ 1700 RPM [ ] Alternators ................................................... CHECK [ ] Pitot Heat ..................................................... ON [ ] Avionics ....................................................... ON [ ] Navigation Lights .............................................. ON [ ] Landing Light .................................... ON (3-5 seconds) ** NOTE: May be left on if desired for safety [ ] ALT 1 & ALT .................... CAUTION LIGHTS OUT & POSITIVE AMPS [ ] Voltage ....................................................... CHECK [ ] Pitot Heat .................................................... OFF [ ] Magnetos .............................................. CHECK LH & RH ** NOTE: RPM Drop ≤ 150, difference between magnetos ≤ 75 RPM [ ] Power Level .................................... DECREASE TO 1000 RPM ** NOTE: RETURN TO e-checklist SHUT DOWN --------- [ ] Avionics Switch ................................................. OFF [ ] Fuel Pump ....................................................... OFF [ ] Ignition Switch ....................................... TOGGLE ON/OFF [ ] Mixture ...................................................... CUTOFF [ ] Magnetos .......................................... OFF (remove keys) [ ] Bat-Alt Master Switches ......................... OFF (right to left) [ ] ELT .............................................. TRANSMIT LIGHT OUT [ ] CAPS Handle .............................................. INSERT PIN [ ] Hobbs Meter .................................... NOTE TIME IN LOGBOOK [ ] Flight Plan ................................................... CLOSE