<?xml version="1.0" encoding="UTF-8"?>
<openChecklist version="1.0">
  <title>Aero Vodochody L-29 Delfin — l29_12_and_24_month_maint_sched</title>
  <contentHash>7e6495a6bb5dbcab6f906f284749b4878e7c45cb4e38cc96dd8e8273753cfe1f</contentHash>
  <aircraft make="Aero Vodochody" model="L-29 Delfin" variant="" category="standard_normal"/>
  <verification sourceFidelity="unreviewed" operationalReview="none" completeness="full"/>
  <rights status="licensed" license=""/>
  <sections>
    <section id="" phase="other" criticality="normal">
      <title>6. Sheduled Maintenance Works</title>
      <item type="note" index="0" tickable="false" memoryItem="false" indent="0">
        <text>(sign “+” marks works, that must be carried out)</text>
      </item>
      <item type="note" index="1" tickable="false" memoryItem="false" indent="0">
        <text>Before starting with the sheduled maintenance it is necessary:</text>
      </item>
      <item type="challenge" index="2" tickable="true" memoryItem="false" indent="0">
        <text>a) to check (according to log book data) the remaining service life of aggregates, pyrotechnical cartridges, testing terms of high pressure gas bottles;</text>
      </item>
      <item type="challenge" index="3" tickable="true" memoryItem="false" indent="0">
        <text>b) to check the implementation of directives, indications, up-dating according to bulletins;</text>
      </item>
      <item type="challenge" index="4" tickable="true" memoryItem="false" indent="0">
        <text>c) to discharge bail out cartridges and EKSR-46 (ÝÊÑÐ-46);</text>
      </item>
      <item type="challenge" index="5" tickable="true" memoryItem="false" indent="0">
        <text>d) to defuel external tanks. Check the remainder of fuel in the fuselage tanks, which must not exceed 700 litres;</text>
      </item>
      <item type="challenge" index="6" tickable="true" memoryItem="false" indent="0">
        <text>e) to carry out the control inspection of the aircraft;</text>
      </item>
      <item type="challenge" index="7" tickable="true" memoryItem="false" indent="0">
        <text>f) to prepare the aircraft for fuselage rear part de-rigging and also all necessary equipment, control and measuring instrumentation, devices and tooling;</text>
      </item>
      <item type="challenge" index="8" tickable="true" memoryItem="false" indent="0">
        <text>g) to lift up the aircraft on ground jacks;</text>
      </item>
      <item type="challenge" index="9" tickable="true" memoryItem="false" indent="0">
        <text>h) to prepare electric power source and ground installation for creating pressure in hydraulic system.</text>
      </item>
      <item type="note" index="10" tickable="false" memoryItem="false" indent="0">
        <text>[TABLE]</text>
      </item>
    </section>
    <section id="" phase="other" criticality="normal">
      <title>7. Periodical works during short-time storage</title>
      <item type="note" index="0" tickable="false" memoryItem="false" indent="0">
        <text>If aircraft is removed from flying for 15 days and more, it must be conservated.</text>
      </item>
      <item type="subtitle" index="1" tickable="false" memoryItem="false" indent="0">
        <text>Cautions</text>
      </item>
      <item type="caution" index="2" tickable="false" memoryItem="false" indent="0">
        <text>1.Fuel system must be filled during all storage period.</text>
      </item>
      <item type="caution" index="3" tickable="false" memoryItem="false" indent="0">
        <text>2.In a case of fuel dump fuel system must be conservated not later than within 24 hours from fuel dump.</text>
      </item>
      <item type="note" index="4" tickable="false" memoryItem="false" indent="0">
        <text>If aircraft is not flying and is not conservated it is necessary:</text>
      </item>
      <item type="subtitle" index="5" tickable="false" memoryItem="false" indent="0">
        <text>7.1. After each 15⁺³₋₂ days</text>
      </item>
      <item type="challenge" index="6" tickable="true" memoryItem="false" indent="0">
        <text>1.Carry out pre-flight inspection. Sand areas, damaged by corrosion, using smooth grit paper, then polish them with GOI (ÃÎÈ) paste, wash with clean petrol and coat with conservating grease. Remove dirt and dust from the aircraft.</text>
      </item>
      <item type="challenge" index="7" tickable="true" memoryItem="false" indent="0">
        <text>2.Coat wheel jack rods and shock absorber rods with CIATIM-201 (ÖÈÀÒÈÌ-201) grease.</text>
      </item>
      <item type="subtitle" index="8" tickable="false" memoryItem="false" indent="0">
        <text>7.2. After each 30⁺⁶₋₃ days</text>
      </item>
      <item type="challenge" index="9" tickable="true" memoryItem="false" indent="0">
        <text>3.Carry out works, which are to be carried out after each 15 days.</text>
      </item>
      <item type="challenge" index="10" tickable="true" memoryItem="false" indent="0">
        <text>4.Examine parts, fabricated of magnesium alloy</text>
      </item>
      <item type="challenge" index="11" tickable="true" memoryItem="false" indent="0">
        <text>5.Dump fuel sediment for water detection purposes (5 litres from each dumping point).</text>
      </item>
      <item type="challenge" index="12" tickable="true" memoryItem="false" indent="0">
        <text>6.Run the engine.</text>
      </item>
      <item type="challenge" index="13" tickable="true" memoryItem="false" indent="0">
        <text>7.Carry out landing gear and flaps test retraction and extension using main and emergency systems. During liquid discharge from the emergency system check nitrogen pressure in hydraulic accumulators using manometer in the cockpit.</text>
      </item>
      <item type="subtitle" index="14" tickable="false" memoryItem="false" indent="0">
        <text>7.3. After each 3 months ⁺¹⁸₋₉ days</text>
      </item>
      <item type="challenge" index="15" tickable="true" memoryItem="false" indent="0">
        <text>8.Carry out woks, which are to be carried out after each 30 days.</text>
      </item>
      <item type="challenge" index="16" tickable="true" memoryItem="false" indent="0">
        <text>9.Check condition of aircraft and engine fuel system, paying special attention to leak-proofness of joints.</text>
      </item>
      <item type="subtitle" index="17" tickable="false" memoryItem="false" indent="0">
        <text>7.4. After each 6 months ⁺³⁶₋₁₈ days</text>
      </item>
      <item type="challenge" index="18" tickable="true" memoryItem="false" indent="0">
        <text>10.Carry out woks, which are to be carried out after each 3 months.</text>
      </item>
      <item type="challenge" index="19" tickable="true" memoryItem="false" indent="0">
        <text>11.Check canopy jettisoning mechanism functioning on the ground, check condition of mechanism locks and hinges, refresh lubrication. Check ejection gun operation by primer washer firing (firing works should be carried out by armourer).</text>
      </item>
      <item type="challenge" index="20" tickable="true" memoryItem="false" indent="0">
        <text>12.Check cockpits pressurization.</text>
      </item>
      <item type="note" index="21" tickable="false" memoryItem="false" indent="0">
        <text>Remark. Before using aircraft for flying after 6 months ⁺³⁶₋₁₈ days of storage (parking) carry out special-purpose inspections and checks after 50⁺¹⁰₋₅ hours.</text>
      </item>
    </section>
  </sections>
</openChecklist>
